Civils, Structural Alterations & Builders’ Works in Connection

Removing redundant plant or tanks frequently requires more than dismantling alone. Access openings and temporary works may be needed, concrete bases may require removal, and the surrounding structure, drainage or finishes may need to be reinstated.

Removal, enabling works and reinstatement managed as one complete project package

KpH Environmental provides coordinated civils, structural alterations and Builders’ Work in Connection (BWIC) for plant removal, tank decommissioning and refurbishment projects.By incorporating the associated construction works into our specialist scope, we can manage the removal, enabling works and reinstatement through one coordinated delivery team.

What Is Builders' Work in Connection (BWIC)?

Builders’ Work in Connection (BWIC) refers to the building, civil and structural works required to support a specialist activity. Most commonly associated with mechanical and electrical services, it covers the enabling works and reinstatement needed where specialist equipment interfaces with the building fabric.

For heavy plant and machinery removal and tank decommissioning and removal projects, KpH Environmental coordinates the BWIC with the removal programme. This ensures that enabling works, structural alterations and builders’ works are completed in the correct sequence, from creating safe access for removal through to the final reinstatement of the site.

Integrating BWIC into Your Project

Plant and tank removal projects frequently require works beyond dismantling and removing the equipment itself. These may include:

Plant-room builders’ works 

Plant-room enabling works

Structural openings and temporary works

Diamond drilling and concrete sawing

Concrete breakout and reinstatement

Tank-removal groundworks

Commercial refurbishment enabling works

Equipment-base construction

Underground drainage installation

Reinstatement of walls, floors, ceilings and finishes

KpH Environmental can incorporate these civil, structural and builders’ works into the delivery of its specialist services, reducing the number of separate contractors and interfaces that the client must manage.

Structural Alterations

Structural alterations may be required to create safe access for the removal or installation of plant, mechanical and electrical equipment, tanks located in basements and below-ground tanks. As a structural alterations contractor supporting specialist removal projects, KpH Environmental can coordinate the formation of access openings, temporary support systems and modifications to existing structural elements.

Depending on the existing structure, access requirements and scope of removal, the works coordinated by KpH Environmental may include:

View more

New Concrete and Masonry Structures

New concrete and masonry structures may be required following plant or tank removal, particularly where access openings must be closed, affected structures repaired or replacement equipment installed.

KpH Environmental coordinates equipment-base construction with the wider removal and installation programme.

Depending on the project requirements, these works may include:

View more

Planning a plant or tank removal project?

Speak to our team about the associated access, structural and reinstatement requirements.

Groundworks, Civils and Drainage

KpH Environmental provides a coordinated civils and groundworks contractor capability for below-ground tank removal, external plant replacement and projects involving underground drainage and identified service interfaces.

Depending on the ground conditions, buried services and scope of removal, the works may include:

View more

Builders’ Works and Reinstatement

KpH Environmental provides a coordinated builders’ works contractor capability for the reinstatement activities arising directly from plant removal, structural alterations and equipment installation.

Depending on the condition and intended use of the affected area, the works may include:

View more

Plant-Room and Commercial Refurbishment Enabling Works

KpH Environmental’s plant-room enabling works support the removal, replacement and refurbishment of mechanical and electrical equipment in operational buildings.

They can include:

  • Forming access openings
  • Installing temporary supports
  • Breaking out redundant concrete bases
  • Adapting services
  • Preparing the area for replacement plant

For wider refurbishment projects, KpH Environmental can coordinate the commercial refurbishment enabling works directly associated with plant-room strip-outs, tank removals and equipment replacement. This service is intended to support KpH’s specialist activities and does not position the company as a general commercial building or fit-out contractor.

We are here to help with general enquiries or quotations.

Please use the Get In Touch form or alternatively, you can call or email us:

KpH Environmental Services covers all areas in the following counties of England:

  • Bedfordshire
  • Berkshire
  • Buckinghamshire
  • Cambridgeshire
  • Dorset
  • Essex
  • Greater London
  • Hampshire
  • Hertfordshire
  • Kent
  • Northampton
  • Oxfordshire
  • Suffolk
  • Surrey
  • Sussex
  • Wiltshire

Our services are not limited to the above list but covers all areas of the UK on request.