Robertson & Farnham Buildings, Stevenage

Brief Description

Scope of work

  • Dismantling and removal of 16 no. air handling units (AHUs)
  • Removal of associated 6” mechanical pipework and ductwork serving AHUs
  • Removal of large redundant rooftop chillers and associated pipework in situ
  • Decommissioning and removal of boilers and associated plant
  • Isolation and removal of electrical control panels, cabling and containment
  • Dismantling and removal of steel gantries and plant support structures
  • Opening up of the roof and installation of a designed fixed scaffold system, serving roof level and internal floors to facilitate safe plant removal

Removal of redundant rooftop chillers and associated pipework

Dismantling and removal of AHUs and ductwork | Controlled removal of gantries and structural supports

Designed fixed scaffold serving roof and internal floors

Key Constraints & Delivery Approach

The project was delivered within live office buildings with ongoing occupancies and critical services in operation for Covid-19 Pandemic. KpH Environmental adopted a highly structured, methodical approach to sequencing, access control and waste removal to ensure zero disruption to building users.

A bespoke waste management strategy was developed to suit the varying floor layouts, allowing for safe removal of large plant items without impacting daily operationthes. This included controlled roof openings and the installation of a designed fixed scaffold system serving both roof level and internal floors.