Tower Bridge, London

Brief Description

Scope of work

  • Due to the location of the tank room, a restricted working area was sectioned off with clear Health & Safety warning signs
  • Operatives set up a gas monitor to continually monitor the LEL levels around the tank and take readings and record every 15 mins ensuring that works were carried out in the safest possible conditions
  • A vacuum tanker was set up at the closest point possible and hose run out into the tank and the remaining product uplifted
  • The tank was cleaned and associated pipework drained and flushed through as much as practicably possible to the boilers
  • Due to no hot works permitted in the area KpH used cold cutting methods to dismantle the vessel
  • Skilled team worked in restricted conditions breaking the tank down to manageable sections for removal to a licensed facility