Marriott Hotel Grosvenor Square

Brief Description

Scope of work

  • Removal of two large chillers including compressors, heat exchangers, and frames
  • Strip out of associated pump sets, valves, and mechanical pipework
  • Dismantling and removal of ductwork, motors, and control panels
  • Isolation, draining down, and safe disconnection of all mechanical services
  • Lifting and extraction of heavy plant through a restricted access route
  • Segregation of materials and compliant disposal
  • Full cleaning and clearance of the plant room in preparation for the next phase

Challenges

  • Confined basement access requiring detailed lift planning and staged removal
  • Tight working space around existing live services
  • Coordination with hotel operations to minimise disruption
  • Safe execution of hot works and mechanical dismantling within enclosed conditions

Outcomes

Phase 1 was completed safely, on programme and to specification.

All redundant mechanical equipment was removed, leaving a clear and compliant plant room ready for future refurbishment and installation works.