Scope of work

  • KpH established a restricted site set up with Heras fencing, site welfare and strict controls in place to avoid cross contamination.
  • All Japanese Knotweed was removed from site via 8 wheel tipper lorries and all lorries passed through the wheel wash.
  • Due to the various materials within the other stock pile, KpH utilised a Screening Machine to segregate the soil, asbestos fragments, plastics, concrete, tarmac, generals waste etc. Dust suppression canons were utilised to dampen down the environment.
  • As part of the project KpH was also instructed to demolish the old clubhouse building, changing rooms and outbuildings onsite.
  • The buildings were stripped out and all rubbish removed prior to demolition via the onsite excavators at long reach.
  • The buildings were reduced to ground level with the slab and footings removed. During the removal of the slab and footings an archaeological survey was carried out to ascertain any archaeological interest.
  • The whole site was reduced to ground level and handed back to Foxleys.

Request a Competitive Quote for our Environmental Services Today.

Clients

SLR Consulting
WS Swift
Colliers
Oakray Limited
Williams Southern Limited Construction
Ayer Associates
SES Water
County Clean Group
Gatwick Airport
Biffa

Working in Partnership with KpH

©2026 KpH Environmental Services Ltd
All rights reserved.

Update cookies preferences