Oil Tank Cleaning and Removal, Tower Bridge, London

Client: CBRE
Project: Tank Clean & Removal

Brief Description:
We were awarded the project by CBRE, to remove 1no 4,500ltr tank from a tank room at Tower Bridge, London. Tower Bridge is a Grade I listed combined bascule and suspension bridge in London, built between 1886 and 1894.  
Scope of Works:
  • Due to the location of the tank room, a restricted working area was sectioned off with clear Health & Safety warning signs
  • Operatives set up a gas monitor to continually monitor the LEL levels around the tank and take readings and record every 15 mins ensuring that works were carried out in the safest possible conditions
  • A vacuum tanker was set up at the closest point possible and hose run out into the tank and the remaining product uplifted
  • The tank was cleaned and associated pipework drained and flushed through as much as practicably possible to the boilers
  • Due to no hot works permitted in the area KpH used cold cutting methods to dismantle the vessel
  • Skilled team worked in restricted conditions breaking the tank down to manageable sections for removal to a licensed facility
 

Request a Competitive Quote

For a quicker quote, please attach pictures in the last section of this form. If you don’t have any, we might ask for a site visit.

If you need an urgent quote, let us know when you need it, and we’ll try our best to meet your requirements.

KpH Environmental Services covers most areas in the UK.

By submitting this form you agree to our Privacy Policy (read our complete privacy policy by clicking here)

Inquiry Form

    Scroll to Top